Proposed Solar Photovoltaic Project

Overview
The proposed solar photovoltaic (PV) solution shall be delivered as a complete end-to-end service. The contractor shall be responsible for ensuring seamless coordination from design, procurement, installation, regulatory compliance, commissioning, and ongoing maintenance to achieve reliable long-term system performance.

1. Scope of Work
The contractor shall undertake the full scope of works, including but not limited to:

• Design & Engineering Services

• Complete Installation
• Licensing & Permits
• Hoisting Activities
• Safety & Risk Assessment
• Professional Engineer (PE) Services
• Procurement of All Materials
• Lightning Protection System
• Structural Assessment
• Overall Commissioning

 

2. Design Principles & Safety Requirements
All system designs must strictly adhere to:
• Design for Safety (DfS) compliance
• Design for maintenance accessibility
• Design for performance optimisation
• Design for tidiness (proper cable management and layout)

Safety provisions shall include:
• Crossover platform for roof gutter access
• Guardrail system at roof edges
• Skylight protection system
• Safety lifeline system
• Cat ladder system

All safety systems shall comply with applicable workplace safety regulations and industry standards.

 

3. Equipment Procurement
• Class A fire-rated solar PV panels
• Panel inverters or equivalent approved brands

 

4. Site Preparation & Installation Logistics
• Staging and material handling
• Cat ladder access
• Cable routing and reeling

 

5. Solar PV System Installation & Commissioning
• Full installation
• Testing and verification
• System energisation

 

6. SP Services Application & Metering Works
• Submission to SP Services
• Meter coordination
• System turn-on
(No additional LEW fees shall be charged)

 

7. Regulatory & Authority Submissions
• SCDF
• BCA
• MAA

 

8. Manufacturer Equipment Warranty
• Solar panels: Full performance warranty throughout the tenure period
• Inverters: Full manufacturer warranty throughout the tenure period

 

9. Workmanship & System Warranty
Full coverage throughout the contract tenure.

 

10. Complimentary Sustainability Advisory
• Government funding
• EV incentives
• EV charging infrastructure

 

11. Power Purchase Agreement (PPA) Requirement
The contractor shall be capable of offering a PPA arrangement, ensuring full coverage of workmanship, system warranty, and solar panel performance throughout the contract tenure.

 

12. Operations & Maintenance (O&M) Requirements

12.1 Performance Monitoring
• 24/7 monitoring with alarm notifications
• Graphical data visualisation
• Monitoring of faults, overheating, pests, and water retention

12.2 Periodic Visual Inspection
• Routine inspections with documentation

12.3 Measurements & Cleaning
• Annual panel cleaning (frequency adjustable based on site conditions)
• DC voltage, insulation, and grounding measurements

12.4 Corrective Maintenance
• Rectification within 48 hours
• Support availability: 7:00 AM – 7:00 PM
• Contractor to remain contactable for DB-related issues


Tender Submission & Project Timeline

• Tender Closing Deadline: 30 April 2026, 5:00 PM

• Planned Work Commencement: 1 June 2026

• Project Duration: 6 months (full completion)


Please send all your bids and supporting documents to bidding.lube@sinopec.com before the deadline.


项目概述
本太阳能光伏系统将以一站式服务方式实施,承包商需负责从设计、采购、安装、审批、调试到后期维护的全过程,以确保系统长期稳定运行。

1. 工作范围
包括但不限于:
设计与工程服务
完整安装
执照与许可
吊装作业
安全与风险评估
专业工程师服务
材料采购
防雷系统
结构评估
整体调试

2. 设计原则与安全要求
必须符合以下原则:
设计安全(DfS
便于维护
性能优化
安装整洁规范

安全措施包括:
跨越平台
护栏系统
天窗防护
生命线系统
猫梯系统

所有安全措施须符合相关法规。

3. 设备采购
• A级防火光伏板
•  太阳能光伏系统或同等品牌逆变器

4. 现场准备与安装
施工安排
猫梯通道
电缆管理

5. 安装与调试
完整安装
测试验证
通电运行

6. SP申请
电表申请与协调
并网通电
(不另收LEW费用)

7. 政府申报
• SCDF
• BCA
• MAA

8. 设备保修
光伏板:整个合约期间性能保修
逆变器:整个合约期间厂家保修

9. 系统与施工保修
覆盖整个合约期间。

10. 可持续发展咨询
政府补贴
电动车政策
充电设施

11. PPA协议
承包商须提供PPA方案,并在合约期间内提供全面保障。

12. 运维要求

12.1 监控
• 24小时监控
报警系统
故障及风险监测

12.2 检查
定期检查并记录

12.3 清洁与测试
每年清洁(可调整)
电气测试

12.4 维护
• 48小时内修复
支持时间:7:00AM–7:00PM
可随时联系处理配电问题


招标提交与项目时间表
投标截止时间: 2026430 下午5:00
计划开工日期: 202661
项目工期: 6个月(全面完成)


请在截止日期前将所有投标书及支持文件发送至 bidding.lube@sinopec.com